Cycle Time Reduction by Using Smed Tool

Main Article Content

J. Ashok Babu, R.S. Mahipal Reddy, P. Mahesh, K. Venkatesh

Abstract

In this work to optimize manpower data and implement more efficient processes, have conducted time study analysis and found out the time worked on the object, found the major NVA contributing operations and what type of NVA are majorly contributing in each operation and suggested best suitable, possible action plan for each waste, the results after their implementation were attached to this work. The after results will affect the overall wastage, thereby reducing the wastage and increase in production by using one of the major lean tool-Single-Minute-Exchange of-Die (SMED).

Article Details

Section
Articles